Sep 15, 2018
Offshore welding at Norther Substation
Offshore welding at the substation of the Norther offshore wind farm. We carried out this work in 2 phases. Firstly, we applied the weld seam preparation to the transition piece for the installation of the topside. After the topside had been installed, our team stepped into action again to weld the topside to the transition piece.